Deir el-Ballas 2019-2020, Week 8: 1/18 – 1/23
The last week for the season. Restoration of the North Palace’s main enclosure wall on the south side of the palace and the restoration of the casemate core of the palace itself are continuing. Bettina Bader has joined us to look at the ceramic material. House E revealed that in...